Bellevue Gold Project, Australia
The probable ore reserves at Bellevue are estimated at 6.8 tonnes (t) grading 6.1g/t gold (Au) and containing 1.34moz of gold, as of June 2022. Mining at Bellevue gold project. The Bellevue gold mine will be developed through conventional mechanised underground longhole stoping mining methods to extract the majority of the ore reserves.
WhatsApp: +86 18221755073